男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

Energy

Datong Coal prepares to expand its industrial chain

By Te Kan (China Daily)
Updated: 2010-11-17 16:44
Large Medium Small

Datong Coal prepares to expand its industrial chain

Datong Coal prepares to expand its industrial chain

Datong Coal plans to spend 2 billion yuan building the largest coal-exploration equipment production base in northern Shanxi province.

The company said its goal is to double the current figures for coal output and total assets in 2012.

Coal production and sales topped 100 million tons for four consecutive years from 2005 to 2008, and hit 122 million, in 2008.

The company wants to develop an industrial chain of "coal-power-construction materials" and "coal- chemicals".

"Green exploration is the core principle we stick to," said Wu Yongping, president of the Datong Coal Mine Group.

The green (environmentally friendly) mining concept depends on science and technology and shows the advantages of a large group in technology, professional experience, equipment and management. The scarce resources of the coal seam need to be finely and carefully mined, the company said.

When the company built the Tashan Circular Economy Park, the first of its kind in the region, it followed the fundamental principle of "reduce, recycle and reuse".

In 2009, the park had a total of 8.7 billion yuan worth of output in 2009.

It was listed in the first group of pilot recycling economy parks by the provincial government. Construction work on it started in 2003.

Several State leaders have visited Tashan, including President Hu Jintao and Vice-premier Li Keqiang.

Tashan Coal Mine, which was expected to turn out 15 million tons annually, went into operation at the end of 2008.

The group owns 54 coal mines in Shanxi and the Inner Mongolia autonomous region, covering a total area that is 300 kilometers east to west, and 600 kilometers north to south.

Since 2005, the annual output has been hundreds of millions of tons for six consecutive years, compared to a mere 80,000 tons annually in the initial stages.

The high-quality coal it produces has been exported to Japan, South Korea, India and Turkey.

To consolidate its place in the coal industry, Datong Coal plans to open six shafts with an annual output of 10 million tons.

It has turned itself into an energy conglomerate, with a core business of coal, power, chemicals, coal machinery, construction materials, and logistics.

The Datong Coal Mine Group goes back to 1949, the year of New China's birth, and it has produced a cumulative total of 1.8 billion tons of coal over the past 60 years.

It has paid a total of 41.3 billion yuan in taxes, making it the No 1 taxpayer of all of China's coal companies.

It has 200,000 employees, and 75 billion yuan in total assets.

Datong Coal prepares to expand its industrial chainBig jet takes off with 100 order
Related readings:
Datong Coal prepares to expand its industrial chain China coal market gets international outlook
Datong Coal prepares to expand its industrial chain Energy consumption to be kept below 4.2b tons of coal by '15
Datong Coal prepares to expand its industrial chain Coal-powered energy consumption to decrease in Q4: NEA
Datong Coal is located in the eastern part of the Datong coal field, and the park is about 30 km south and 20 km from the group's headquarters. It covers a floor space of 387 hectares and it has attracted 17 billion yuan ($2.49 billion) in investment.

The 10 park projects are a coal mine, eight plants, and one railway. The Tashan coal Mine will have an annual output of 15 million tons; the coal preparation plant will have an annual output of 15 million tons; the pit-mouth power plant will have an annual generating capacity of 1,200 megawatt; the power plant for the comprehensive utilization of resources will have an annual generating capacity of 220 mW; there is a methanol plant with an annual capacity of 1.2 million tons; a plant with an annual output of 240 million bricks of coal rubble; a plant that produces 50,000 tons of kaolin a year; a dry cement clinker production line with a daily production of 4,500 tons; a sewage treatment plant which handles 4,000 cubic meters of sewage daily; and the railway which is used for transport around the park.

主站蜘蛛池模板: 肃北| 台州市| 三原县| 聂拉木县| 嘉定区| 临泽县| 宁海县| 晋中市| 靖安县| 南江县| 沙河市| 石河子市| 莎车县| 顺昌县| 黄石市| 北票市| 腾冲县| 阜平县| 泸溪县| 育儿| 石楼县| 竹山县| 甘德县| 绥芬河市| 关岭| 云梦县| 正阳县| 濮阳县| 崇仁县| 五台县| 安乡县| 乌拉特中旗| 大洼县| 河东区| 黑龙江省| 南召县| 府谷县| 中西区| 青河县| 丰台区| 霸州市| 明光市| 阿荣旗| 晋中市| 海口市| 临沭县| 额敏县| 华容县| 洪洞县| 武山县| 十堰市| 晋城| 聊城市| 修文县| 法库县| 苏州市| 抚松县| 霍林郭勒市| 桂东县| 大宁县| 共和县| 南漳县| 建湖县| 五河县| 水富县| 河北区| 邹城市| 张家港市| 东乡族自治县| 梁山县| 霞浦县| 许昌市| 宣化县| 石城县| 龙南县| 旬阳县| 寿光市| 铜山县| 洛宁县| 绥德县| 雷山县| 长泰县|