男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

Society

Pollution hinders South-to North water diversion

By LIANG CHAO (China Daily)
Updated: 2010-07-06 07:42
Large Medium Small

Pollution hinders South-to North water diversion
The Dapu sewage treatment plant in Lianyungang city, Jiangsu province, begins operations on May 17. The plant is located on the South-to-North Water Diversion project's eastern route and can process 100,000 tons of sewage every day. [China Daily] 


Tengzhou, Shandong - Authorities are still struggling with concerns about the poor water quality of the eastern route of the South-to-North Water Diversion (SNWD) project eight years after the eastern route's construction began.

Related readings:
Pollution hinders South-to North water diversion More pollution control for water diversion project
Pollution hinders South-to North water diversion Resettlement for water project begins in C China
Pollution hinders South-to North water diversion China plans on drinking-water source protection
Pollution hinders South-to North water diversion Beijing's water shortage worsens as SNWD project delayed

Vice-Minister of Environmental Protection Zhang Lijun said thousands of polluting paper mills and alcoholic beverage factories have been shut down to improve the water quality of the world's largest water diversion project.

A State Council-approved directive issued before the eastern route's construction required local authorities to ensure the water quality is at least Grade 3, the minimum standard for water that is drinkable after treatment.

Director of the SNWD office under the State Council Zhang Jiyao said: "There is still a long way to go before local authorities transform the eastern route into a clean-water corridor and ensure the quality won't decline again."

The construction of key pollution-control facilities is slated for the end of this year, Zhang said on Monday.

The facilities include manmade wetlands, which will purify urban waste water, and pipelines linking urban sewage treatment plants, he said.

Measures will prioritize curbing pollution caused by irregular aquaculture, rural sewage and small shipping wharfs scattered along the Grand Canal near the eastern route.

Zhang urged local authorities to monitor pollution upstream of the Dangjiangkou Reservoir - the water supply source of the SNWD's central route - to prevent pollution from entering the reservoir or contaminating its under-construction trunk canal.

The SNWD project will take water from the massive Yangtze River in the South to satisfy demand in the North's drought-prone cities, such as Beijing and Tianjin. The eastern, central and western routes will each stretch more than 1,000 km.

Construction began on the eastern route in 2002 and a year later on the central route. The eastern route is still on the drawing board and is scheduled for completion by 2013.

The eastern route's first phase involves improving canals to connect river systems to channel water mainly through Jiangsu and Shandong - the two provinces along the route with the worst water pollution - to Tianjin.

All 426 pollution control projects have broken ground, and 399, or 94 percent, of them have been completed, Zhang's office reported. Two-thirds of them are operating at more than 80 percent of capacity.

The new industrial pollution control facilities have also achieved more than 90 percent of the standard for sewage discharge .

Testing in the first quarter found water quality is at least Grade 3 in 23 trunk canals, or 66 percent of the sections planned for the eastern route south of the Yellow River.

主站蜘蛛池模板: 醴陵市| 华阴市| 临沭县| 丹棱县| 阳东县| 安溪县| 思茅市| 白河县| 屯留县| 上饶市| 神池县| 永福县| 东城区| 岳阳县| 聂拉木县| 五河县| 横峰县| 邳州市| 大同县| 和龙市| 郑州市| 奉新县| 扶沟县| 衡山县| 寿宁县| 永寿县| 新津县| 读书| 长岭县| 郓城县| 蓬安县| 综艺| SHOW| 贵德县| 全南县| 桐乡市| 铁岭县| 怀仁县| 大厂| 韶山市| 长岭县| 古蔺县| 宁国市| 马尔康县| 莱芜市| 三亚市| 临漳县| 台州市| 广元市| 钟山县| 龙州县| 土默特右旗| 祁连县| 广河县| 宣武区| 兴和县| 元朗区| 普洱| 砀山县| 禹城市| 满城县| 红安县| 手游| 新乡县| 德令哈市| 江西省| 南岸区| 唐山市| 乌拉特中旗| 海宁市| 广水市| 鄂州市| 武穴市| 津市市| 许昌市| 密山市| 阿克苏市| 昭觉县| 土默特左旗| 手游| 长春市| 永顺县|