男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
US EUROPE AFRICA ASIA 中文
China / Society

New Beijing subway to ease traffic congestion

By Zheng Xin (China Daily) Updated: 2012-11-26 07:23

The Beijing subway's Line 6 is scheduled to begin operating by the end of the year after undergoing more than two years' construction, metro authorities said over the weekend.

Passengers will first be able to travel Line 6, which will run from Wuluju in Haidian district in the west of the city to Caofang in Chaoyang district in the east, on Dec 28. Among its many benefits, the new line is expected to alleviate traffic congestion, according to the Line 6 project department of the China Railway Tunnel Group.

"It's believed subway Line 6, with its greater space for passengers and faster speed, will lead to smoother passenger flow during rush hours," said Wu Wenjie, deputy director of the department.

Wu said the line is now being put through various tests.

"We need to make sure everything is working well, from the subway's signal system to the elevators," Wu said. "We can't tolerate any negligence or carelessness, especially in the project's final phase."

The line will connect 20 stations and be able to accommodate 1,960 people in a single run. That's more than can be carried in a single trip on any of the city's current subway lines.

Line 6 will also be the fastest in the city's subway system, capable of reaching a speed of 100 km an hour.

"Subway Line 6 will far exceed the current high speed of 80 km per hour (in the Beijing subway system)," Wu said. "It will only take 48 minutes to travel the whole line, in part because the stations it connects are pretty far apart from each other."

The longest distance between two consecutive stations on the line is 4,001 meters, according to the department.

Beyond capacity and speed, Line 6 will connect to the deepest station in the capital's underground transport system.

The line's connection to the existing Dongsi station, where Line 5 now goes, will lie 34 meters underground, the department said.

Nearly 235 wells have been dug around the station to prevent water from seeping into it. All of them are 142 meters deep and 1 meter in diameter, according to Zhuo Linjian, technical supervisor of the Line 6 project department of the China Railway Tunnel Group.

"The construction team has overcome lots of the difficulties that arise from complicated underground geological conditions," he said.

zhengxin@chinadaily.com.cn

Highlights
Hot Topics

...
主站蜘蛛池模板: 民县| 手游| 桂东县| 谢通门县| 辽宁省| 阳江市| 花莲市| 金门县| 瑞丽市| 台州市| 新营市| 龙川县| 门头沟区| 重庆市| 定州市| 元谋县| 鄂托克旗| 巫溪县| 嘉黎县| 酒泉市| 平顺县| 临邑县| 余姚市| 泾源县| 开封县| 辉县市| 南京市| 巴东县| 遵化市| 金乡县| 边坝县| 隆化县| 乌海市| 天长市| 余江县| 清水县| 松阳县| 巴东县| 秀山| 龙口市| 东台市| 关岭| 毕节市| 贵港市| 永和县| 西吉县| 天祝| 平乡县| 乐东| 长沙县| 吴堡县| 新绛县| 彩票| 南阳市| 玉山县| 开远市| 高淳县| 图片| 洞头县| 河西区| 宝山区| 潢川县| 乌拉特前旗| 宁武县| 龙泉市| 海兴县| 沁水县| 灵石县| 聂荣县| 宣城市| 云浮市| 平塘县| 怀来县| 循化| 长垣县| 星座| 儋州市| 泸溪县| 衢州市| 乐陵市| 海伦市| 永州市|