男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
   
  home feedback about us  
   
CHINAGATE.WEST DEVELOPMENT.infrastructure    
    Key Issues  
 
  Sustainable development & environment  
  Industrial restructuring  
  Infrastructure  
  Market mechanism  
  Capital market  
  High-tech  
  Education & HR  
  Overseas Investment  
  Minority prosperity  
  East-west cooperation  
  Agriculture  
  Travel  
 
 
       
       
       
     
       
       
       
       
 
 
 
Rail link brings rest of world to Tibet


2005-10-17
China Daily

The first fully-loaded train to cover the entire Qinghai-Tibet Railway route arrived in Lhasa, the Tibet Autonomous Region, on Saturday.

The historic journey added a perfect finishing touch to what President Hu Jintao described, in his congratulatory message at the celebration ceremony, as an "unparalleled feat" on the "roof of the world."

Like our second manned space flight, which is arousing both pride and envy at home and abroad, the 24-billion-yuan (US$2.96 billion) project is the fruit of our growing comprehensive national strength.

Tibet's need for and dream of a rail link with the rest of the country did not start until in 2001, when construction began.

The region had for decades remained the only province-level administrative area in China without a railway, because we had neither the money nor the technology.

We should first pay tribute to the railway workers that contributed either their ideas or physical strength to making the decades-old wish come true.

Our scientists demonstrated impressive competence in the uncharted waters of railway construction at extremely high altitudes.

A total of 960 kilometres of the 1,142-kilometre Golmud-Lhasa section of the railway are at least 4,000 metres above sea level. The track reaches 5,072 metres at Tanggula Pass.

At such altitudes, frozen soil, the fragile ecology and oxygen deficiency were believed to be insuperable natural barriers to railway building. Among voices of dissent, there was the claim that a railway like this would result in irreparable damage to the environment.

In total, 550 kilometres of the tracks were laid on frozen soil. Vegetation was meticulously preserved. Pollution was kept to a minimum. In order not to disrupt the seasonable migration routes of animals, including the famous Tibetan antelope, planners added to their blueprints a network of culverts.

At such altitudes, often considered unsuitable for human habitation, railway building is not only a challenge to human wisdom, but first of all a test of physiological endurance.

For that alone, the railway should forever be appreciated with respect and gratitude for its builders.

Each sleeper and section of track they laid took a huge effort, quite aside from the construction of the numerous bridges and tunnels that dot the Qinghai-Tibet Railway.

They have made history not just in China but the whole world.

The railway, which they sweated for four years to build, is set to make history in the country's strategic attempt to balance regional development.

The rail link does more than incorporate the Tibet Autonomous Region and part of Qinghai Province in the national railway network. It will prove a significant boost to economic progress on the Qinghai-Tibet Plateau.

The lack of a rail link with the rest of the country had long been a major obstacle to the area's economic ambitions. The railway will considerably reduce transport costs and accelerate the flow of commodities when it begins trial operations in July 2006.

Unlike traditional track-rolling missions, the first train was not loaded to full capacity with sand or rocks, but arrived at Lhasa on Saturday carrying aid.

Major State firms have donated 12,300 tons of various materials, including chemical fertilizers, wheat flour and steel products, in an enthusiastic response to the Ministry of Railways' idea to turn the track-rolling trips into aid missions.

Tibet has been receiving assistance from both the central government and fraternal provinces.

With the newly acquired rail link, the people of Tibet can expect even more benefits from afar.

 

 
   
 
home feedback about us  
  Produced by m.szjzcy.com. All Rights Reserved
E-mail: webmaster@chinagate.com.cn
主站蜘蛛池模板: 建德市| 河北省| 安化县| 万源市| 无棣县| 新宁县| 三江| 龙川县| 柳林县| 凌云县| 文昌市| 渝北区| 茂名市| 长汀县| 河源市| 铁力市| 衡阳县| 抚松县| 光泽县| 扶绥县| 蒙山县| 富民县| 革吉县| 奎屯市| 台南县| 左权县| 巫溪县| 通化县| 南宫市| 信宜市| 西藏| 仁怀市| 巴彦县| 双城市| 徐州市| 奉节县| 高阳县| 乃东县| 拉孜县| 宝丰县| 呼玛县| 宜兰市| 南汇区| 阿克| 青浦区| 尉氏县| 鄂尔多斯市| 盐边县| 留坝县| 房山区| 乾安县| 广安市| 屏东县| 高台县| 东阳市| 霍林郭勒市| 本溪市| 盐山县| 重庆市| 分宜县| 鄂尔多斯市| 忻州市| 沂源县| 景洪市| 光泽县| 新安县| 马龙县| 米易县| 六盘水市| 九台市| 南宁市| 抚州市| 沙坪坝区| 洛川县| 荔浦县| 江达县| 温宿县| 香港| 宝清县| 当雄县| 长治市| 涪陵区|