男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
  Home>News Center>World
         
 

NASA seeks methods to repair shuttles in flight
(Agencies)
Updated: 2004-12-07 08:57

NASA is hoping techniques that would enable a crew to repair damages to a space shuttle in flight will be ready for the shuttle's planned May 2005 return to space, officials with the agency said on Monday.

The shuttle's launch, which has been delayed several times, would be the first flight since the Columbia broke apart as it re-entered the Earth's atmosphere in February, 2003.

That disaster, which killed the seven astronauts aboard the shuttle and rained debris down on east Texas, was caused by cracks in the protective tiles that were struck by a piece of foam during the shuttle's launch.

NASA hopes that closer in-flight inspections and repairs -- once thought impossible -- could prevent a repeat of that incident.

"It still is a challenge in front of us. We still have a long way to go," Bill Parsons, space shuttle program manager, told a news conference.

NASA will use new sensors that could detect potential problems and has been developing materials and procedures to repair the tiles and reinforced carbon panels during flight.

However, the launch of Discovery, currently planned for between May 12 to June 2, 2005, would not be delayed if those techniques were not perfected.

"I think in a state of emergency we would have a technique we would be ready to put forth," Parsons said.

Since the Columbia disaster, NASA has altered the launch vehicle that propels the shuttle off the launch pad and out of the Earth's atmosphere in order to reduce the debris shed by the craft.

New techniques for applying foam to the launch vehicle have reduced the size of debris that can break off to no larger than 0.008 pound, well below the 0.03 pound threshold that can cause damage to the shuttle, Wayne Hale, the deputy program manager, told the press conference.

The piece of debris blamed for damaging the Columbia's tiles weighed more than one pound.

The latest delay to the shuttle's launch was blamed on several lost work days because of the four hurricanes that buffeted Florida and the Kennedy Space Center there.

NASA officials said they were hopeful they would be ready for the May launch window but would not proceed unless they were certain the preparations were adequate.

"We are going to fly when we determine the vehicle is ready to fly," Hale said. "We're not going to succumb to some kind of emotional schedule pressure because we picked a date and ringed it on a calendar and we think our reputation depends on launching on that date."



 
  Today's Top News     Top World News
 

Record deals inked with Germany, Italy

 

   
 

Presidents tout strong relations with Italy

 

   
 

Poor mines barred, on hold

 

   
 

Polluters ignore environmental laws

 

   
 

Khatami: Iran's democratic reforms failed

 

   
 

9 killed in attack on US mission in Saudi

 

   
  Twelve killed in attack on US mission
   
  7 blasts reported in Spain after ETA threats
   
  Bush determined to see Iraqis vote January 30
   
  Russia: Korea nuke talks in late Jan.
   
  Taliban vows to disrupt Karzai's swearing in
   
  Russia tempers support for Ukraine leader in crisis
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  Related Stories  
   
NASA postpones launch of super-fast jet to Tuesday
   
Shuttle's Spring 2005 launch date delayed
  News Talk  
  Are the Republicans exploiting the memory of 9/11?  
Advertisement
         
主站蜘蛛池模板: 琼海市| 禹城市| 黔西| 黔江区| 容城县| 承德市| 新建县| 临泉县| 清水县| 台南县| 页游| 惠东县| 锦州市| 盐城市| 盘锦市| 彭山县| 简阳市| 绥棱县| 利川市| 巴林左旗| 绥德县| 游戏| 丰原市| 张家口市| 瑞丽市| 镇远县| 栖霞市| 庆阳市| 苍山县| 高陵县| 新巴尔虎右旗| 德保县| 竹北市| 新河县| 田林县| 灵宝市| 九寨沟县| 蒙城县| 卢湾区| 聂拉木县| 化德县| 报价| 太白县| 五指山市| 肇庆市| 龙陵县| 灵武市| 台山市| 龙口市| 什邡市| 吴川市| 南乐县| 常熟市| 达孜县| 龙游县| 天津市| 罗田县| 漠河县| 潍坊市| 扶风县| 西藏| 富阳市| 乌鲁木齐县| 雷州市| 温宿县| 珠海市| 禹州市| 东乌珠穆沁旗| 茌平县| 五原县| 乐东| 长岛县| 抚顺市| 永胜县| 丰镇市| 娄底市| 高清| 陇南市| 尖扎县| 道孚县| 镇原县| 乌鲁木齐县|