Introduction of South-to-North Water Diversion Project

(chinadaily.com.cn) Updated: 2014-11-21

Introduction of South-to-North Water Diversion Project

[Photo from nsbd.gov.cn]

The South-to-North Water Diversion Project, the world's largest of its kind, runs across the watershed of China's four major rivers–the Yangtze River, Huaihe River, Yellow River and Haihe River–with more than 10 provinces (autonomous region, municipalities) involved. Due to the length of the water diversion line and the large cover area, this large-scale water project is very complicated but highly profitable. It includes almost every aspect of water projects, such as the construction of reservoirs, lakes, canals, watercourses, dams, pumping stations, tunnels, aqueducts, culverts, inverted siphons, pccp pipelines, channels and so on. The project is unprecedented both at home and abroad in terms of its scale and degree of difficulty.

The South-to-North Water Diversion Project is the largest water diversion work in the world. After completion, up to 44.8 billion cubic meters of water will be diverted annually, including 14.8 billion through the Eastern Route, 13 billion through the Middle Route and 17 billion through the Western Route. After the first phases of both the Eastern Route Project and the Middle Route Project are finished, the amount of water to be diverted to the north is expected to be 18.27 billion cubic meters. The water diverted is expected to arrive in Beijing via the Tuancheng Lake Open Channel, an emergency water supply project in the Beijing-Shijiazhuang Section of the Middle Route Project.

Introduction of South-to-North Water Diversion Project
[Photo from xinhuanet.com]

The South-to-North Water Diversion Project stretches the longest water diversion distance in the world, with the main canals of the Eastern, Middle and Western routes totaling 4,350 km. The first phase of the Eastern Route Project and the Middle Route Project under construction is 5,599 km long, consisting of 2,899-kilometer main canals and 2,700-kilometer first-tier supporting branch canals through six provinces (cities) along the two lines.

The South-to-North Water Diversion Project aims to alleviate acute water shortages in North China, especially regions along the Yellow River, Huaihe River and Haihe River, covering a vast area of 1.45 million square kilometers, which approximately accounts for 15 percent of China's land territory (9.6 million square kilometers). If an investment of 50,000 yuan ($8,160) to 100,000 yuan brings one job opportunity, more than 180,000 jobs can be created by the first phase of the Eastern Route Project and Middle Route Project under construction every year. Once the completed parts come into use, the improved water supply conditions in the north can stimulate economic and social development and thus create more jobs. In addition, this project is expected to bring huge benefits in various aspects, including agricultural water supply, flood control, shipping, waterlogging drainage and eco-environment. In the long run, the average direct economic result of the South-to-North Water Diversion Project can reach 55.3 billion yuan per year if taking the price level in 2000 as the standard.

Specials

Nanyang Special 2019

Nanyang clay sculpture works win gold medals at the Sixth Central Plains (Hebi) Cultural Industries Fair.

Footer bakcground
Copyright ? China Daily. All Rights Reserved.
Sponsored by Nanyang Municipal Government. Powered by China Daily
主站蜘蛛池模板: 乐东| 贵溪市| 兰溪市| 桃江县| 睢宁县| 郸城县| 西吉县| 安平县| 沿河| 南木林县| 仪陇县| 龙川县| 绥化市| 洪江市| 旺苍县| 瓦房店市| 友谊县| 肇州县| 无极县| 唐海县| 三都| 乌什县| 台中市| 甘肃省| 新乡市| 玉龙| 竹北市| 凭祥市| 贵州省| 巴里| 连平县| 富源县| 镇江市| 涿鹿县| 武安市| 福鼎市| 康乐县| 清新县| 秦皇岛市| 宁德市| 徐汇区| 栾川县| 临夏市| 长葛市| 留坝县| 安图县| 杭州市| 仲巴县| 历史| 佛教| 保亭| 雅江县| 宣汉县| 南城县| 桦川县| 延安市| 嘉鱼县| 彭泽县| 玛沁县| 汉寿县| 十堰市| 汾阳市| 东港市| 乌拉特前旗| 洛隆县| 通许县| 唐海县| 张家川| 潮州市| 常宁市| 蓝田县| 如皋市| 陇南市| 五常市| 桐梓县| 安新县| 定陶县| 北碚区| 杨浦区| 思茅市| 保靖县| 聊城市|