男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
 
 
Home > Tianjin North Port

Container operation zone

Updated: 2012-09-19

The Tianjin North?Port?is expected to?allocate three large container terminals: namely, the East Pierhead, the Free Trade Zone and the North Pierhead. The coastline is 9.96 km long in total, and the land occupies an area of 7.8 sq km. There are 32 container berths in total, achieving a carrying capacity of 16 million TEU/year.

The container terminal at the East Pierhead includes the berths respectively located at the Port Basin #4 and the northern and southern sides of the East Pierhead. They are now completed. The coastline is 3,164m long in total, with a carrying capacity of 3.8 million TEU/year.

In addition, the coastline of the terminals affiliated to the Port Basin #4 Container Terminal Company is 826 m long, the bottom elevation is -15.2 m high, the land is around 430m deep, and the carrying capacity is up to 1 million TEU; the coastline of the Orient container terminals to the south of the East Pierhead is 1,136m long, with the bottom elevation of -12m high, the land is between 230-400m deep, and the carrying capacity is 1.3 million TEU; the coastline of the Five Continents International Container Dock to the north of the East Pierhead is 1,202 m long, the bottom elevation is -15.2m, the land is 300 m deep, and the carrying capacity is 1.5 million TEU.

Because the East Pierhead lacks supporting land, the plots of land to the south of Xingang No.4 Road and the east area of parking lots for the four zones will be integrated into supporting land for the East Pierhead container terminals after the planning of "North-to-South Mineral Diversion". After that, the supporting land will cover an area of 1.72 sq km.

The container terminals to the east of the free trade zone include Phase I, Phase II under construction and the proposed Section C container terminal for the North Port Basin. The coastline is 3,300m long in total. From the boundary Lingang Road, the depth is 770 m, covering an area of 2.5 sq.km2. 10 container berths range 50,000-100,000 DWT, with a carrying capacity of 6.6million TEU/year. In the near future or for a middle-term run, the container terminals to the east of the free trade zone serve as the main force of marine mainline transportation for developing containers Tianjin Port.

The North Pierhead Container Terminal starts from the Support System Zone to the North Branch Port Basin 1# to the boundary with Tianjin North Port, and the coastline is 3.5 km long in total. After the planning, the land area is bordered respectively by Linhai North Road, Xingang No.7 Road and Yuejin Road, with land area up to 3.58 sq km. Then, ten 50,000-100,000DWT container berths will be established, realizing a carrying capacity of around 5.6 million TEU.

Chinese port launches first blockchain customs system

2019-06-24

The Tianjin Port blockchain pilot project, an initiative using blockchain technology in cross-border trade, was launched April 17 in Tianjin.

This Day, That Year: June 24

2019-06-24

In 1980, the Port of Kobe established friendly ties with the Port of Tianjin.

Copyright ? 2012 China Daily All Rights Reserved
Official Investment Portal of Tianjin Port
Sponsored by Tianjin Port
Constructed by China Daily
主站蜘蛛池模板: 霍林郭勒市| 博白县| 昭苏县| 花垣县| 修武县| 郎溪县| 中山市| 高尔夫| 合水县| 瑞丽市| 北海市| 柳林县| 宣汉县| 达拉特旗| 新和县| 纳雍县| 明星| 昌吉市| 女性| 台江县| 定安县| 桐乡市| 石阡县| 永丰县| 临夏市| 乐昌市| 晋中市| 长海县| 梁河县| 赤城县| 曲麻莱县| 太谷县| 巧家县| 孟连| 牙克石市| 呼和浩特市| 辽宁省| 临桂县| 无为县| 深州市| 蓬溪县| 贵溪市| 喀什市| 方山县| 英吉沙县| 依安县| 蕲春县| 彭州市| 怀远县| 宣城市| 五常市| 陇南市| 松潘县| 青阳县| 花莲市| 德安县| 吴江市| 昌平区| 彭泽县| 西和县| 磐安县| 凤凰县| 遂宁市| 贞丰县| 额敏县| 花莲市| 天峨县| 治多县| 武威市| 双流县| 乾安县| 嘉义市| 佛坪县| 上杭县| 基隆市| 商水县| 崇明县| 德保县| 都江堰市| 龙里县| 高要市| 福泉市|