男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
China
Home / China / Deputies and Members

Construction continues on Sichuan-Tibet Railway

By LUO WANGSHU | chinadaily.com.cn | Updated: 2022-03-09 16:58
Share
Share - WeChat
A Fuxing bullet train runs on the Lhasa-Nyingchi railway in the Tibet autonomous region on June 24, 2021. Jiao Hongtao/For China Daily

Construction on the third section of a high-profile railway connecting Sichuan province and the Tibet autonomous region is ongoing, a political adviser told Xinhua News Agency recently.

"The Sichuan-Tibet Railway is a strategic project with many challenges, including a complicated geological structure, which will make construct extremely difficult, and a sensitive environment in the region," said Lu Chunfang, an academician of the Chinese Academy of Engineering.

Lu is also a member of the Chinese People's Political Consultative Conference National Committee and general director of the Qinghai-Tibet Railway, the first railway in Tibet.

Lu and his team has carried out research on the Sichuan-Tibet railway, proposing more than 100 technical suggestions, the Science and Technology Daily reported.

Upon completion, the Sichuan-Tibet Railway will cross eight mountains, and more than 93 percent of the line will consist of bridges and tunnels, Lu said.

The line will include six tunnels stretching more than 30 kilometers, with the longest tunnel 42 km, he said, adding that the tunnels will not only be long, but also buried deep underground.

"The deeper the tunnel goes underground, the more pressure it puts on the rocks," he explained, which will create a higher risk of collapse.

Building the bridges will also be problematic.

"The bridge that will pass over the Nujiang River will be 610 meters tall, which is nearly the same height of Shanghai Tower, China's tallest building (632 m tall)," he added.

Tibet's sensitive environment is another issue. The line passes 75 environmentally sensitive points, including natural reserves and water conservation areas, all posing challenges to construction, Lu added.

The 1,838-km Sichuan-Tibet Railway project is divided into three parts.

Two parts have been completed and are currently running. The Chengdu-Ya'an section in Sichuan opened in 2018, and the Lhasa-Nyingchi line began operating last year.

The third and most challenging section, linking Sichuan and Tibet between Ya'an and Nyingchi, began in 2020.

The date of the railway's planned completion has yet to be revealed.

Upon completion, the railway will be the second to link Tibet with the rest of the country, following the Qinghai-Tibet Railway, which opened in 2006.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 申扎县| 曲松县| 乐山市| 苗栗县| 鲁山县| 永州市| 嘉鱼县| 云梦县| 祁东县| 沽源县| 盐亭县| 卢湾区| 达孜县| 奎屯市| 和龙市| 东兰县| 陇川县| 乌鲁木齐县| 石柱| 扬中市| 五原县| 视频| 涞源县| 甘孜县| 平邑县| 灵寿县| 福安市| 西城区| 威宁| 西宁市| 岱山县| 睢宁县| 克东县| 昌邑市| 英德市| 龙岩市| 南投县| 神农架林区| 井陉县| 仪陇县| 奈曼旗| 合阳县| 邢台市| 宝兴县| 宣化县| 乌审旗| 会昌县| 潮安县| 安达市| 乡宁县| 乌苏市| 商丘市| 天长市| 正阳县| 水城县| 登封市| 太仆寺旗| 泽库县| 乐东| 海兴县| 沂源县| 炎陵县| 汨罗市| 株洲县| 城口县| 墨竹工卡县| 邛崃市| 临西县| 平果县| 平南县| 鹤峰县| 洪泽县| 万州区| 上饶市| 五大连池市| 乐业县| 房产| 吉林市| 巴彦县| 东港市| 洛浦县| 黔南|