男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Make me your Homepage
left corner left corner
China Daily Website

Capital's subway system branches out

Updated: 2013-01-04 09:08
By Zheng Xin (China Daily)

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

 
 
...
主站蜘蛛池模板: 克山县| 清新县| 宝丰县| 财经| 平顺县| 仪陇县| 岢岚县| 布拖县| 乐至县| 兰西县| 平塘县| 本溪| 福清市| 巴中市| 基隆市| 镇康县| 乐至县| 清水河县| 枝江市| 封丘县| 鲜城| 炎陵县| 曲阳县| 北安市| 汤原县| 共和县| 时尚| 锡林浩特市| 舟山市| 茶陵县| 西昌市| 青川县| 个旧市| 黄陵县| 邛崃市| 兴化市| 康保县| 叙永县| 兴安盟| 防城港市| 英吉沙县| 周口市| 芜湖市| 洛南县| 荃湾区| 邢台市| 侯马市| 太仆寺旗| 策勒县| 子洲县| 南充市| 荥阳市| 嫩江县| 伊宁县| 霍城县| 临汾市| 韶关市| 格尔木市| 来凤县| 南雄市| 乐东| 武功县| 朝阳县| 娄底市| 方城县| 封开县| 镇江市| 缙云县| 拜城县| 雷波县| 泊头市| 小金县| 石楼县| 冀州市| 许昌县| 富民县| 延川县| 盘锦市| 高淳县| 镇宁| 原阳县| 新建县|