男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

Negligence cited in subway accident

Updated: 2011-10-08 08:14

By Wu Yiyao (China Daily)

  Comments() Print Mail Large Medium  Small 分享按鈕 0

SHANGHAI - Negligence, breaches of regulations and the faulty installation of backup power systems caused the subway crash in September, and 12 people responsible for it have been punished, investigators said on Thursday.

On September 27, a Line 10 train smashed into another one that was stopped between Laoximen and Yuyuan stations in the afternoon after a signal failed. There were no deaths, but 295 people were injured, and as of Oct 7, about 70 remained hospitalized.

Line 10 is one of the newest in the Shanghai subway system.

The investigative team's report, released on Thursday, said the immediate cause of the accident was errors made after the subway's electronic signaling system failed due to a power loss and drivers were forced to operate trains with signaling by phone.

About 40 minutes before the accident, construction at Xintiandi station - just next to Yuyuan station, where the accident occurred - caused a power loss to the signaling system.

The automatic train control monitor failed to function and was switched to manual control, according to the report.

Subway operators then directed trains by phone. One ordered a train to stop in the tunnel between Laoximen and Yuyuan, and another ordered a train to head toward the one that had stopped. When the driver saw the stationary train, he tried unsuccessfully to brake and crashed at 35 kilometers an hour into it.

The subway dispatcher did not accurately know where the trains were when the phone orders were given, which is a breach of regulations, while the workers on duty at the station agreed to receive the order against rules, which directly led to the train crash, according to the report.

The dispatcher was suspended and the administrator on duty was given demerits. Ten others who bore responsibility in the accident were also punished.

Tang Zhihua, chief dispatcher of the Line 10 operation control center, Kuo Kang, deputy manager of the dispatch control center of Line 10, and Zhu Limin, deputy director of the dispatch department of Shentong Group - operator of the subway line - were dismissed, according to the Shanghai Administration of Work Safety.

Yu Guangyao, president of Shentong Group and Ying Minhong, the Shentong Group chairman, were given demerits.

The accident has put Shanghai Metro into one of its hardest times, and all the employees must work harder to earn the forgiveness and support of passengers, a press release from Shanghai Metro said.

Passengers said the accident has cast a shadow on their daily commute.

"Human errors are easily neglected, and this was not the first accident on the Shanghai subway caused by human error. Who knows when there will be another?" said Li Cheng, a Shanghai resident who takes subway Line 10 twice a day.

A staff member at the South Shaanxi Road station who spoke on condition of anonymity said Line 10 passenger flow was not significantly less when operation resumed after the accident.

More than 7 million people passengers took subway trains on Oct 1.

China Daily

(China Daily 10/08/2011 page4)

主站蜘蛛池模板: 江达县| 乌兰察布市| 龙岩市| 潞城市| 湖州市| 道孚县| 茶陵县| 威宁| 酒泉市| 涞源县| 霞浦县| 镇远县| 松溪县| 延长县| 吴旗县| 年辖:市辖区| 广宁县| 甘洛县| 平潭县| 塔河县| 分宜县| 南皮县| 宜兴市| 科技| 英山县| 皋兰县| 长白| 如东县| 漠河县| 北票市| 罗城| 长丰县| 甘南县| 普定县| 长治县| 山西省| 双柏县| 南汇区| 丽水市| 隆德县| 达孜县| 外汇| 搜索| 临颍县| 潞西市| 洪雅县| 浪卡子县| 阿巴嘎旗| 东明县| 临夏市| 花莲市| 桂林市| 乐至县| 江西省| 留坝县| 北宁市| 岱山县| 望都县| 泰州市| 固安县| 浦东新区| 宁安市| 阳泉市| 长春市| 合水县| 平远县| 建湖县| 吴忠市| 梧州市| 辽阳市| 吴川市| 沙雅县| 宁安市| 吉安县| 始兴县| 河南省| 隆子县| 开化县| 舒兰市| 通河县| 卢氏县| 枝江市|