Home / Our Business / Equipment Installation

Equipment Installation

CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

 

Electromechanical Equipment Installation in the Three Gorges Water Conservancy Project (China)

In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.

Read more

 

Electromechanical Equipment Installation in the Gezhouba Water Conservancy Project (China)

In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.

Read more

 

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Read more

 

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (China)

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.

Read more

 

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

Read more

 

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Read more

 

Electromechanical Equipment Installation at the Longtan Hydropower Station (China)

CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.

Read more

 

Electromechanical Equipment Installation at the Pubugou Hydropower Station (China)

For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 浪卡子县| 富宁县| 体育| 雷州市| 汤阴县| 岳阳市| 锡林郭勒盟| 揭东县| 遵化市| 九寨沟县| 丹棱县| 留坝县| 出国| 兴海县| 合水县| 沙雅县| 光泽县| 镶黄旗| 东辽县| 柞水县| 武宁县| 通江县| 仙桃市| 西藏| 虹口区| 右玉县| 德江县| 道孚县| 兴义市| 临朐县| 丰城市| 孝昌县| 青浦区| 鄂托克前旗| 杨浦区| 张掖市| 四平市| 绥中县| 河东区| 镶黄旗| 瓮安县| 朔州市| 杭锦后旗| 吕梁市| 山西省| 昌黎县| 娄烦县| 菏泽市| 余干县| 嵊州市| 桂平市| 宜章县| 德州市| 平潭县| 红原县| 平邑县| 铁力市| 府谷县| 礼泉县| 松阳县| 长宁县| 望谟县| 武强县| 桃园市| 齐齐哈尔市| 邹平县| 漳州市| 北流市| 略阳县| 大新县| 铅山县| 墨竹工卡县| 治县。| 惠安县| 利川市| 高平市| 客服| 桃源县| 噶尔县| 宜城市| 红原县| 简阳市|