男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

World's longest-span cable-stayed bridge undergoes load test before opening

Xinhua | Updated: 2025-06-19 10:09
Share
Share - WeChat
An aerial drone photo taken on May 24, 2025 shows the Changzhou-Taizhou Yangtze River Bridge under construction in East China's Jiangsu province. [Photo/Xinhua]

NANJING -- The final pre-opening safety checks have begun on the Changtai Yangtze River Bridge, the world's longest-span cable-stayed bridge, as engineers launched a high-stakes week-long load testing campaign on the hybrid rail-road structure early Tuesday in East China's Jiangsu province.

A series of scientifically rigorous load tests will thoroughly evaluate the actual performance of this world-class multifunctional bridge, which will provide crucial data for its subsequent safe operation, according to the Jiangsu provincial transport engineering construction bureau, the bridge's developer.

Spanning 10.03 kilometers, this engineering milestone integrates highways, intercity railways, and local roads across two levels. Its main channel features a record-setting 1,208-meter central span supported by cables, while its two auxiliary channel bridges each boast 388-meter steel arch spans, the longest worldwide for their type.

All load testing occurs exclusively at night to avoid temperature fluctuations affecting the steel-based structure, with over 800 sensors deployed to track micrometer-level structural shifts, according to the bureau.

During the first night's static test, 30 four-axle trucks weighing 1,200 tonnes were positioned like "six vehicles side-by-side on the upper highway deck and four on the lower rail-road deck," according to technicians, mimicking the weight of 800 passenger cars. The trucks remained stationary for eight hours to measure structural responses.

Seven days of trials cover 119 static and 111 dynamic scenarios across all bridge sections. The most intense static test will mobilize 110 trucks weighing 4,400 tonnes simultaneously on the main span, according to the bureau.

Dynamic examinations later this week include simulated traffic flows with braking and bumping sequences.

Scheduled for completion by late 2025, the bridge will slash travel time between Changzhou and Taizhou in Jiangsu province from 80 minutes to 20 minutes, boosting development for the Yangtze economic belt and integration of the Yangtze River delta region.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 康定县| 宣化县| 赤峰市| 绥芬河市| 南和县| 许昌县| 罗城| 思南县| 邓州市| 曲靖市| 福鼎市| 崇左市| 宜兰县| 喀喇沁旗| 化德县| 德兴市| 马鞍山市| 福安市| 会理县| 泗阳县| 定边县| 岳阳市| 全南县| 施秉县| 东乌珠穆沁旗| 漳浦县| 彝良县| 图木舒克市| 五华县| 福建省| 余干县| 阿拉尔市| 如皋市| 灵武市| 安仁县| 茌平县| 石家庄市| 安平县| 望都县| 万年县| 连州市| 格尔木市| 庄河市| 潜江市| 扶风县| 达尔| 芮城县| 道孚县| 涪陵区| 宜春市| 怀仁县| 安陆市| 孟津县| 柯坪县| 屯留县| 夹江县| 保亭| 金秀| 九龙城区| 嘉荫县| 江川县| 岢岚县| 灵丘县| 仙居县| 五莲县| 湟源县| 肃宁县| 石屏县| 张家口市| 宁远县| 南宫市| 长沙市| 双城市| 台江县| 吴旗县| 锡林郭勒盟| 边坝县| 宣威市| 衡山县| 吉水县| 阿瓦提县| 延边|