男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
 
English 中文
go to FORTUNE.com

Powered by Chinadaily.com.cn

 
home Contact us go to FORTUNE.com
News
Special Report
People
Webcast
Photos
China Economy
Conference
· Intro & Theme
· Schedule
· Speakers
· Venues
·Sports Roundtable
·Cultural Roundtable
·Participants
 
  China Economy
Priority projects of Shaanxi Province
[ 2005-05-15 15:05:25]



I. Project Name:
MTO Project in Binchang Coal-chemical Industrial Zone

II. Project Implementation Agency:
Leading Group Office of Energy & Chemical Base Construction in Northern Shaanxi

III. Project Description:
It is planned to establish an annual production capacity of 1.5 million tons carbinol by taking coal as raw materials and adopting Deshgu coal gasification technologies, compositive carbinol technologies of Germany Lurgi and 3-towers fine distillation process, to form an annual production capacity of 0.27 million tons ethene, 0.23 million tons propylene and 0.068 million tons butylenes by use of technologies from carbinolto alkene, of USA UOP. The raw coal needed of 2.03 million tons to the project will be provided by Xiaozhuang coal mine. The planned production capacity will be 6 million tons.

IV. Total Investment and Cooperation Form:
The total investment of the project is about US$ 1.01 billion.Multiple cooperation forms can be adopted, such as sole investment, joint venture, cooperation and etc .

V. Anticipation of Market and Investment Return:
It is predicted in China that the demand of ethane in 2007 will be 20.2 million tons with domestic satisfaction rate of 49%, and 33 million tons with an annual increase rate of 10.3% in 2012. The average annual sales income of the project is about US$ 346.4 million. Its EIRR is 15.3% and investment payback period is 8 years.


Contact Person: Wang Jianping, He Xin
Tel:+86-29-87294264
Fax: +86-29-87294680
Add:Shaanxi Dev. & Reform Commission, Xincheng, Xi'an 710006




I. Project Name:
Construction of Production Facilities of Carbinol

II. Project Implementation Agency:
Leading Group Office of Energy&Chemical Base Construction in Northern Shaanxi

III. Project Description:
The project is to construct a chemical plant, which takes local rich good quality coal as the raw materials to produce carbinol. Advanced processing technology will be introduced to the project. The project scopes are to construct production capacity of 2.3 million tons of carbinol annual and produce by-products including propylene and polypropylene. The project will be completed in two stages. A production capacity of 600 thousand tons of carbinol will be built in the first phase, with which, annual 1.37 million tons of coal will be consumed.

IV. Total Investment and Cooperation Form:
Total investment of the first phase project is US$ 299.88 million.In which, the fixed asserts investment is US$ 272.07 million. Joint Venture is welcomed.

V. Anticipation of Market and Investment Return:
With the first phase project, it is forecasted that the annual revenue will be US$ 117.78 million, profit US$ 38.69 million, tax US$ 20.56 million. The investment profit rate is 15.08%, the investment profit and tax rate 20.01%, the IRR 16.35%(after tax). The investment recovery period is 7.6 year.


Contact Person: Wang Jianping, He Xin
Tel:+86-29-87294264
Fax: +86-29-87294680
Add:Shaanxi Dev. & Reform Commission, Xincheng, Xi'an 710006

   上一頁 1 2 3 4 5 6 7 8 9 10 下一頁   >>|

 
 
All rights reserved. Powered by Chinadaily.com.cn
 
主站蜘蛛池模板: 黄龙县| 枣庄市| 郁南县| 神池县| 巧家县| 德清县| 平罗县| 宿迁市| 五家渠市| 碌曲县| 盐源县| 仁怀市| 万山特区| 彭泽县| 襄城县| 武夷山市| 永福县| 普安县| 冷水江市| 常山县| 桐庐县| 原平市| 扬中市| 田阳县| 嘉善县| 榆树市| 惠州市| 西峡县| 贵德县| 玛曲县| 忻城县| 凤冈县| 焦作市| 衡南县| 罗定市| 承德市| 澎湖县| 大足县| 江山市| 当阳市| 定西市| 宜都市| 田阳县| 房产| 卓资县| 桐城市| 南昌县| 太原市| 大余县| 民丰县| 随州市| 枣庄市| 新巴尔虎右旗| 商水县| 鄂托克前旗| 额尔古纳市| 天津市| 鹰潭市| 铜梁县| 三河市| 涞水县| 饶河县| 扶余县| 安庆市| 奉化市| 呼和浩特市| 陆河县| 乡宁县| 清水河县| 航空| 石城县| 乌鲁木齐县| 三台县| 漠河县| 合江县| 镇安县| 怀来县| 鄂尔多斯市| 鄢陵县| 永清县| 饶河县| 凯里市|