男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
 

Home / Press/ News

Pakistan Jinnah Hydropower Station connects to the grid

Updated: 2013-10-12

On Oct 9 the CEEC-constructed Pakistan Jinnah Hydropower Station was connected to the power grid, with all of its eight generating units put into commercial operation.

Read more

 

Main work of the largest U-shaped water delivery project completed

Updated: 2013-10-07

On Sep 28, the No.54 section of Tuanhe Aqueduct of the middle line of the South-to-North Water Diversion Project, which is the world's largest U-shaped water delivery aqueduct that is undertaken by CGGC, was completed, 90 days ahead of the schedule.

Read more

 

CGGC wins the project of Wudongde spillway tunnel

Updated: 2013-10-07

On Sep 29, CGGC won the construction project of section I of the civil construction and installation of metal structure of the spillway tunnel of Wudongde Hydropower Station.

Read more

 

CGGC-undertaken Blue Mountain Tunnel Project wins praise

Updated: 2013-09-26

On Sep 16, Raphael Boveda Bonia, the minister of the Strategic Coordination Ministry, and Walt Solis, the minister of the Ministry of Resources, inspected the Blue Mountain Tunnel Renovation Project untaken by CGGC.

Read more

 

CEEC wins Nepal Zhongbaitaike Hydropower Station EPC contract

Updated: 2013-09-23

On Sep 20 CEEC was awarded the EPC contract for civil engineering and metal structure of Nepal Zhongbaitaike Hydropower Station, with a contract value of $90.78 million.

Read more

 

Boiler installation starts for largest Iraqi Oil/Gas Fired Power Plant

Updated: 2013-09-17

On Sep 15 Baghdad time, the first steel structure of No.1 boiler of the Salah Al-Din 2*630 MW Oil/Gas Fired Power Plant was successfully hoisted and positioned in place.

Read more

 

CEEC hands over 181 low-income settlement houses in Angola

Updated: 2013-09-12

181 low-income settlement houses in Malanju province were completed by CEEC and handed over to the owner on Sep 9 after passing acceptance inspection.

Read more

 

Parit Baru Coal Fired Power Plant construction commences

Updated: 2013-09-07

A groundbreaking ceremony was held on Sep 5 in Bengkayang district, West Kalimantan province, Indonesia, to celebrate the commencement of construction of Parit Baru Coal Fired Power Plant.

Read more

 

No.3 generator unit of Vietnam Haiphong Power Plant connects to the grid

Updated: 2013-09-05

On Aug 30, the CEEC-designed No.3 generator unit of Phase-2 project of Vietnam Haiphong Power Plant was put into operation and connected to the grid.

Read more

 

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

Read more

 


   5    >>|

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 奈曼旗| 方城县| 工布江达县| 昂仁县| 南投市| 丘北县| 吕梁市| 淄博市| 若尔盖县| 北辰区| 吉木萨尔县| 呼和浩特市| 黑龙江省| 岚皋县| 元朗区| 湛江市| 兴和县| 北碚区| 社旗县| 灵台县| 武汉市| 沙坪坝区| 沛县| 内乡县| 蕲春县| 昌都县| 若羌县| 温州市| 漳州市| 罗田县| 商丘市| 兰西县| 馆陶县| 宜宾市| 将乐县| 如皋市| 永宁县| 绥滨县| 邢台市| 吉首市| 运城市| 镇巴县| 莎车县| 海门市| 涪陵区| 会理县| 湾仔区| 成都市| 巫溪县| 乐昌市| 祁阳县| 大安市| 读书| 理塘县| 武隆县| 遵化市| 安岳县| 贵南县| 莱阳市| 三台县| 苏尼特左旗| 东源县| 基隆市| 察哈| 苍南县| 商丘市| 马龙县| 保山市| 江口县| 岚皋县| 息烽县| 遂平县| 德安县| 浮山县| 瑞丽市| 丁青县| 鄱阳县| 寿光市| 巴彦淖尔市| 永昌县| 天气| 龙海市|